Report by
Subway Temp Violations Cited
6 years ago •reported by user-xxtq8815 • details
Inspection Failure: 2019-9-24
Details: OBSERVED THE EXPOSED HANDWASHING SINK IN THE FRONT SERVICE PREP AREA NOT MAINTAINED DUE TO NOZZLE MISSING FROM FAUCET TO PROPERLY OPERATE THE HOT/COLD WATER. INSTRUCTED PERSON IN CHARGE THAT HOT AND COLD RUNNING WATER MUST BE PROVIDED AND THAT HOT WATER AT…
Details: OBSERVED THE EXPOSED HANDWASHING SINK IN THE FRONT SERVICE PREP AREA NOT MAINTAINED DUE TO NOZZLE MISSING FROM FAUCET TO PROPERLY OPERATE THE HOT/COLD WATER. INSTRUCTED PERSON IN CHARGE THAT HOT AND COLD RUNNING WATER MUST BE PROVIDED AND THAT HOT WATER AT…
173
Comments
Comment
