2200 North Lincoln Avenue,
Chicago,
60614
Illinois,
United States
Report date: May 22, 2020
3. Management, food employee and conditional employee; knowledge, responsibilities and reporting
- comments: found no employee health policy/training on site. Instructed facility to establish an appropriate employee health policy/training system and maintain with verifiable documents on site. Priority foundation violation 7-38-010.
5. Procedures for responding to vomiting and diarrheal events
- comments: found no procedure/plan and kit for responding to vomiting and diarrheal events. Instructed facility to develop and maintain a procedure/plan and to maintain any appropriate supplies on site. Priority foundation violation 7-38-005.
39. Contamination prevented during food preparation, storage & display
- comments: partial of waste pipe are installed above disposable cups,food container. Must be encased said pipe or relocate mentioned items to prevent contamination. Surface must be smooth cleanable and non-absorbent surface -
47. Food & non-food contact surfaces cleanable, properly designed, constructed & used
- comments: broken rubber gasket inside two door reach-in freezer,in dining area. Repair/replace. Surface must be smooth cleanable and non-absorbent surface
47. Food & non-food contact surfaces cleanable, properly designed, constructed & used
- comments: must not use milk crates as a means of elevation for stored items -
51. Plumbing installed; proper backflow devices
- comments: no back flow prevention device provided at ice machine water line,at prep area. Must install so back flow prevention device may be located to be serviced and maintain.
53. Toilet facilities: properly constructed, supplied, & cleaned
- comments: no lid provided at receptacle in washrooms. Need to provide -
54. Garbage & refuse properly disposed; facilities maintained
- comments: door that enclose garbage area not maintained at bottom and between door with gap. Instructed repair door.
55. Physical facilities installed, maintained & clean
- comments: broken,peeling paint on ceiling at basement area. Repair/repaint ceiling. Also metal sheet on floor at inside the walk-in cooler must be replace at front of the door. Surface must be smooth cleanable and non-absorbent surface
55. Physical facilities installed, maintained & clean
- comments: excess unused items in basement area and at staircase(first floor). Instructed to remove and elevate items needed 6'off the floor. -
Source:
chicago.gov